At a Glance

  • Ideal start window: Begin master-plan design in November or December 2026 to break ground in March or April 2027.
  • Typical pre-construction time: About 3 to 6 months for a full custom project, depending on size, HOA review, and whether permits are required.
  • Primary bottlenecks: HOA architectural review (commonly 30 to 60 days, set by your community’s own rules) and Pikes Peak Regional Building Department (PPRBD) permits for walls over 4 feet, larger or attached structures, and gas, electrical, or plumbing work.
  • The spring penalty: Starting the process in March or April often pushes a major custom build into late summer or fall, so you spend your best outdoor months looking at a construction site instead of using the space.

If you are planning a custom outdoor living space, a hillside retaining wall system, or a full property master plan for next year, the most common mistake we see is starting too late. Homeowners tend to think of landscaping as something that begins when the weather warms. For larger projects, the real work starts months earlier, in an office, long before an excavator touches your property.

It is now late November. If you want a finished outdoor space for summer 2027, this is the right moment to begin.

How Far in Advance Should You Start Designing a Custom Landscape in Colorado Springs?

For a full custom design-build project, plan on roughly 3 to 6 months of pre-construction work before the first day of excavation. That window covers surveying and design, HOA approval if your neighborhood has one, engineering and permit review if your project requires it, and ordering materials. This is very different from a quick refresh. Laying sod, replacing a few shrubs, or adding mulch can often happen within weeks. But a project that involves grading, drainage, boulder terracing, a patio and outdoor kitchen, or a covered structure is closer to building a small addition than doing yard work. It has to be designed accurately, approved by the people who need to approve it, and engineered where the building code requires it. Each of those steps has its own clock, and some of them are out of your contractor’s hands. If you start in November or December, that timeline lands you in a good place: ready to break ground in March or April, as soon as the ground and weather allow.

What Does a Realistic Spring 2027 Timeline Look Like?

Here is how the phases typically line up for a project starting in late 2026. Many of these overlap, so the total is shorter than adding up every row.
Project Phase Target Window Typical Duration What Happens and What Can Slow It Down
1. Site analysis and master plan Nov – Dec 2026 3 – 6 weeks Site survey, soil and drainage assessment, concept design, and 3D renderings. Slows down when scope or budget decisions take time.
2. HOA / architectural review Jan – Feb 2027 Often 30 – 60 days Material samples, plant lists, and drawings submitted to the board. Timing depends on the association’s meeting schedule and any revision requests.
3. Engineering and PPRBD permits Jan – Mar 2027 Roughly 4 – 8 weeks (planning estimate) Stamped drawings for walls over 4 feet and structures. PPRBD does not publish a fixed turnaround, so review time varies with complexity and corrections.
4. Material procurement Feb – Mar 2027 3 – 6 weeks Ordering stone, boulders, timber, and outdoor appliances. Custom and specialty items take longer.
5. Groundbreaking and build Mar – May 2027 6 – 16+ weeks Excavation, structural hardscape, irrigation, and planting, depending on size and weather.
The durations for the HOA, engineering, permit, and procurement phases are planning estimates based on typical projects, not guarantees. Your own timeline depends on your association, your project, and how quickly decisions get made.

How Long Do HOA Landscape Approvals Take in Colorado Springs?

Plan on about 30 to 60 days for HOA architectural review, but check your own community’s rules, because each association sets its own process. Colorado law does not set a single review deadline for landscaping applications. Instead, state law requires that an association’s decisions on architectural and landscaping requests follow the standards and procedures in its own governing documents and not be arbitrary or capricious. That means your covenants, not a statewide rule, control the timeline.

If your home is in a community with an architectural review board, such as many of the established neighborhoods around the Broadmoor, Cathedral Pines, Pine Creek, and Flying Horse, the practical bottlenecks are usually the same:

  • Monthly meetings. Many boards meet once a month. Miss the submission deadline for one meeting, and you may wait another month for the next.
  • Complete packets. Boards often want drawings, material samples or swatches, plant lists, lighting details, and sometimes notes on how drainage will be handled. An incomplete packet can be sent back without review.
  • Revision requests. A single request for changes can add another review cycle, which can add roughly another month.

Your best defense is a complete, well-organized application. Not every neighborhood has an HOA, and some have simple guidelines, so the first step is always to read your covenants and ask your management company how the process works.

One helpful note: Colorado law has also limited what HOAs can prohibit when it comes to water-wise landscaping, which matters for projects that replace turf. Your design team can help you present those elements properly in your application.

Which Landscape Projects Require Building Permits in El Paso County?

Permits in Colorado Springs and El Paso County are issued by the Pikes Peak Regional Building Department (PPRBD) under the 2023 Pikes Peak Regional Building Code. The most common triggers for landscape and outdoor living projects are:

  • Retaining walls over 4 feet. A wall taller than 4 feet, measured from the bottom of the footing to the top of the wall, requires a permit and engineered plans. A wall of any height that supports added weight, such as a driveway above it, also requires one.
  • Covered structures. Pavilions, pergolas, and other roofed structures are subject to permit and zoning review. Small, detached, single-story accessory structures up to 200 square feet are generally exempt, but larger structures and anything attached to the house typically are not.
  • Decks. Attached decks require a permit, and freestanding decks more than 30 inches above grade require one as well.
  • Gas, electrical, and plumbing work. Running natural gas to an outdoor kitchen or fire feature, adding electrical circuits, or installing plumbing generally requires permits and licensed trades.
  • Tall fences. Fences over 7 feet require a permit.

Two other points matter for planning. First, tiered or terraced wall designs deserve a careful look, because in some Colorado jurisdictions closely spaced walls are treated as a single taller wall. We confirm how a design will be reviewed before finalizing it. Second, a project may need zoning or setback review from the City of Colorado Springs or El Paso County in addition to the building permit.

Rules and fees change, so always confirm current requirements with PPRBD before you build. We handle that coordination as part of a project, but it is useful to know what is coming.

Why Does Starting Design in Winter Save Time and Money?

Starting in late fall or winter means the slow, paperwork-driven steps happen while the ground is still too cold for a full construction season. That timing gives you three practical advantages.

You get ahead of the spring rush. In our experience, requests for major outdoor projects surge once the weather warms, and the best installation dates fill up. If your design, HOA approval, and permits are already finished by March, you are ready to schedule when the ground thaws instead of starting the process then.

You build in a cushion. If your HOA asks for a revision or a permit reviewer has questions, a November start gives you room to respond without losing your construction window.

You can plan materials early. Custom quarry stone, large boulders, timber for pavilions, and built-in grill islands can have longer lead times than standard materials, and availability varies by product and supplier. Finalizing your plan in winter lets us order early and, depending on the supplier and contract terms, can help lock in pricing.

The payoff is a simple one. A project that starts building in March or April can be finished in time for you to enjoy the space in summer 2027. A project that starts planning in April often does not begin construction until late summer or fall, which means you spend the best outdoor months watching it get built.

What to Do Right Now

If you are considering a project for next year, here are the steps worth taking in the next few weeks:
  1. Read your HOA covenants and find out whether your community has an architectural review process, who to contact, and when the board meets.
  2. Walk your property and list your goals. Think about how you want to use the space: dining, entertaining, a fire feature, a quiet retreat, or fixing a slope that has been a problem.
  3. Schedule a site consultation. Early conversations let us assess the slope, soil, drainage, and access, and tell you honestly what your project is likely to require.
  4. Decide on a rough budget range. This shapes the design and helps us advise on which phases make sense now and which can wait.

Start Your Spring 2027 Plan

The sooner a custom project is designed, approved, and permitted, the sooner it can be built. If you would like to have an outdoor living space ready for summer 2027, contact Fredell Enterprises to schedule a late-fall or winter site consultation. We will walk your property with you, map out a realistic timeline, and help prepare your design, HOA packet, and permit schedule so that you are ready to break ground as soon as spring arrives.

Permit and code information in this article reflects PPRBD’s 2023 Pikes Peak Regional Building Code and El Paso County guidance as reviewed in November 2026. Requirements change, and every project is different, so confirm current rules with PPRBD and your HOA before building.